Scientific and technological innovation projects in 2008 This study for the Nam Theun Mine Sump slime particles thickness uneven distribution, dredging cycle is short, labor-intensive, and unsafe operation issues, in-depth study of the new technology water positions efficient mechanical dredging, new equipment, new methods and supporting technology.
South Tuen coal mine
The thickness of the mixed slime new Sump automatic dredging process and system equipment
The items on the card report
Yanzhou Coal Mining Company Nantun coal mine
The Xuzhou Tianke Machinery Manufacturing Co., Ltd.
December 2007
1. Learn Tianke Machinery Manufacturing Co., Ltd. has been fine slime water positions slime dredging process, find the thickness of the slime coexist processing simpler, more reasonable, more environmentally friendly process.
2. Developed the slime dredging machine and supporting mobile systems, mixing device:
Key Indicators: normal hatch coarse mixer, mixing, crushing and pumping head integration design. The φ30 following particles can be pumping capacity long-distance transmission.
3. Design efficient work area at both ends of the feed coal slurry dewatering filter presses, high efficiency, small size
Main indicators: the filter press pump optimization design, reasonable selection of filter cloth, the pressure filtration efficiency 10%; split design pressure filtration pump station with console, convenient device operation.
The 4.MC-1 type slime rough extension designs have been finalized: 0.3MM more particles separated by rough extension and automatic loading automatically into the buffer, the separation of the slime water mixing tank separation process by an efficient filter press.
The thickness of slime in the water compartment automatic mixing, pumping, grading, dewatering, loading pipeline operations.
Key technologies and objectives
Key technologies
1.Slime water containing the thickness of the particle mixing, pumping and conveying technology:
MQ-1 type slime dredging conveyor: the machine innovation previous design, the removal of stir Sump slime slime, slime conveying set integrated automatic dredging machine, the machine free to move, the highly aggregated mixing and pumping and pumping equipment can swing around, move up and down to different heights, the different orientation slime stirring pumping. The level of transmission distance up to 1200 meters), the slime conveying a concentration of 50%, the operator need only one person to achieve a the water positions slime in the real sense of the Qing automatically dig conveying. Its key technologies: automatic mixing slime water, automatic filter debris, stirring collection and pumping height, stirring pumping full range of work, long-distance transmission of high concentration slurry.
Thickness slime separation, neither affect the use of the filter press, they can not Paste screen
Patent development and design of new products "MC-1 type of coarse slime extension": It is specifically for the complex nature of slime, designed to provide continuous and efficient filter press quality to be separated slime slime separation equipment, main The aim will be not easy to press dewatering slime coarse first isolated from Slime, which can improve the quality of the coal slurry dewatering, but also greatly enhance the efficiency of coal sludge dewatering. The key technology is the thickness of the slime separation of coarse slime automatically loading all fine slime able to enter the filter press equipment.
Efficient dehydration. Coal washing mud
Development and design of new "ZQ-4 type high efficiency continuous pressure filter": Based on the slime dewatering treatment of in-depth research and a summary of the many years of experience, we will develop new efficient continuous filter press, the aircraft breaking the traditional filter press filter theory , under the same conditions in the size of the equipment, a substantial increase in unit production of slime. Key technologies: filter press hydraulic control, dual work area, both ends of the feed, automatic loading.
Overall goal
Nantun Coal Mine thickness slime mixed new Sump developed automatically cleared digging process and system equipment, automatic cleanup of various properties of slime, automatic separation, automatic loading transport, solve Clearance labor intensity, insecurity, low efficiency, Problems of pollution roadway. Promote the construction of coal modern mine slime dug civilized production and production safety.
Overall technical program:
1) The equipment consists of: the water position dredging system was stirred by the slime equipment, slime conveying equipment, buffer mixing vessel, the slime separation equipment (loading conveyor belt) four major components.
2) The process route:
Sump slime impact of high-pressure water, stirring, broken ----> slime clear dug pumping ----> slime the rough segmentation (separation of coarse slime loading) ----> buffer mixing container, stir ----> double-acting, separation filter press dewatering ----> belt conveyor loading automatically.
Process is as follows:
The Sump slime by high pressure water impact stir reaches a certain concentration of large particles are crushed with slime pump transportation to the water hatch slime crude extension within, will be greater than 0.3mm or more coarse slime separation Firstautomatically loaded mine car. The remaining slime water from entering the buffer container, the buffer containers to store a certain amount slime dewatering filter press in order to ensure that there is always a sufficient supply of slime. Due to slime sedimentation fast, so must add stir agencies keep stirring to prevent precipitation. The dehydrating filter press will buffer the stirring tank of the slime is conveyed to a certain pressure into the filter press chamber, the slime dehydration. Prolapse of the slime through the filter press the lower part of the conveyor belt loading automatically or sent to another belt away, prolapse of the water back to another water storage impoundments. Slurry the clean-up process is complete.
System equipment performance parameters:
No. |
Device Name |
Device model |
Quantity |
Parameter name |
Parameter values |
1 |
Slime dredging conveyor |
MQ-1 |
1 |
Transport coal slurry concentration% |
50 |
Slime transport granularitymm |
φ15 | ||||
Transport outlet pressureMPa |
1.2 | ||||
Conveying flowM3/h |
25-33 | ||||
Motor Power kW |
28 | ||||
Water distribution pressureMPa |
2.5 | ||||
2 |
Slime crude ext. |
MC-1 |
1 |
Coarse slime productionT/h |
5 |
High-frequency vibration powerkW |
2.2*2 | ||||
Mixing Power kW |
4.0 | ||||
Buffer capacityM3 |
2.0 | ||||
3 |
Efficient continuous filter press |
ZQ-4 |
1 |
Dry slime production T/h |
8-12 |
Slime moisture% |
<30 | ||||
Feeding pressureMPa |
0.7 | ||||
The pressure of the hydraulic cylinder MPa |
16 | ||||
Pumping station motor power kW |
28 | ||||
Conveyor belt motor power kW |
3 |
Project budget sheet amounts: 10,000
No. |
The name and the basis for calculation of the cost of the project |
Sum |
Remark |
1 |
Research and operating expenses |
8.0 |
|
2 |
Processes, equipment design fees |
9.0 |
|
3 |
Equipment manufacturing fee |
78 |
|
4 |
On-site industrial test fee |
12.0 |
|
5 |
Project appraisal fee |
3.0 |
|
6 |
Management fees |
8.8 |
Total funding8% |
|
Total Amount |
118.8 |
|
Project leader, project team members and the division of labor
The 10.1 project leader and members
(1) Project Leader (unit, name, title, position):
Nantun Coal Mine, Yanzhou Coal Mining Company Limited: Ping Zengjiang senior engineer, chief engineer
Xuzhou Tianke Machinery Manufacturing Co., Ltd.: heralds senior engineer, general manager
(2) Subjects staff
Yanzhou Coal Mining Company Nantun coal mine:
The Xuzhou TIANKE Machinery Manufacturing Co., Ltd.:
Shiwan Ming Senior Engineer, Chief Engineer
Li male senior engineer, technical Minister
The quarter benefits righteousness senior engineer, deputy general manager of
Zhu Xingmin senior engineer, deputy general manager of
The Dongsheng Ming Senior Engineer, director of the assembly shop