Of Belt Conveyor turn device application in of Shandong Lineng new River Mine (stoping Win)

Release date:2012-11-6  information:The Xuzhou mine Tianke Mining Technology Co., Ltd.

Shandong Lineng New River Mine is an annual output of 100 tons of modern mine. Mine ready in the first half of 2004, the new mechanized mining face complex geological conditions, supporting the face transport Lane to open up to the point of the two variants, and a change in slope of the following specific conditions, distance: 870m , volume: 630T / h, with speed: 2m / s bandwidth: 1000mm with strong: 1000s. Transport line in figure I. Complicated due to the variable slope change to the presence of so original transport system, a belt conveyor to be able to solve the transport distance, is now going to three the belt conveyor lap to complete. This will greatly increase the cost of production.
After extensive research, the the Xuzhou TIANKE Machinery Manufacturing Co., Ltd. production belt conveyor turning device are B10034Z, B10006 (small). Secondary concrete pouring, ground anchors, mounting way. So only a power of 2 × 90kW belt conveyor to complete the transportation task. Specific arrangement shown in Figure.
Corner transport belt conveyor turning device can replace multiple conveyor lap, reducing the number of equipment layout Face coal system, reduce leasing costs; less playing equipment cavern, reduce production costs; reduce the total installed power of the coal transport system, reduced operating costs; simplify the transportation system, and improve the reliability of the transit system. Very impressive field practice has proved effective. Due to the application of the belt conveyor turning device, shorten the the roadway construction time and installation time. At the same time, the belt conveyor turning device structure is simple, less wearing parts, and easy to replace, and little maintenance, operates under pressure with the role, avoid streamers, can better ensure fully mechanized mining face production.
The transport system has been running since June 2004 Installation, good running condition.